Our projects

Through its years of experience in the construction of CHP-projects in Flanders and Wallonia Ecogen can present an extensive reference list of completed projects. Our CHP-project portfolio has reached a total operational electrical power output of over 80 MegaWatt, and this in various CHP-applications. Below some reference cases to various applications:
Industry Tertiary sector Biogas

Alpro Wevelgem

Alpro Wevelgem

Alpro is the European pioneer and market leader of soy-based drinks and food products (margarines, desserts and vegetable variations on yogurt and cream).

Take a look

Industry

Alpro

Execution: 2013/2014
Location: Wevelgem
Sector: Food industry
CHP: INNIO Jenbacher JMS 612
Electral output: 2.000 kWe
Thermal output: 2.557 kWth
fuel: 90% natural gas / 10% biogas
Project:

  • integration CHP in existing boilerhouse
  • steam and hot water recuperation for processes.
  • electrical integration in internal grid of the plant
  • Biogas treatment

Ferrero Ardennes

Execution: 2008
Location: Arlon
Sector: Food industry
CHP: INNIO Jenbacher JMS 616 + JMS 612
Electral output: 4.240 kWe
Thermal output: 4.848 kWth
fuel: natural gas
Project:

  • integration CHP's in existing boilerhouse
  • steam and hot water recuperation for processes.
  • electrical integration in internal grid of the plant
  • including transformator and medium tension switchgear

Steenbakkerijen van Ploegsteert

Execution: 2009
Location: Ploegsteert
Sector: Construction industry
CHP: INNIO Jenbacher JMS 412
Electral output: 889 kWe
Thermal output: 1.123 kWth
fuel: natural gas
Project:

  • integration CHP in accoustical enclosure
  • heat recuperation for drying process bricks
  • direct exhaustgas utilization and hot water recuperation
  • through production hot air for drying processes

Provital (Cosucra)

Execution: 2010
Location: Warcoing
Sector: Food industry
CHP: INNIO Jenbacher JMS 420
Electral output: 1.487 kWe
Thermal output: 1.861 kWth
fuel: natural gas
Project:

  • integration CHP in accoustical enclosure
  • heat recuperation for dryingproces
  • part exhaustgas utilisation to thermal oil circuit
  • hot water recuperation through production hot air for drying processes

tertiary sector

European Council Brussels / Justus Lipsius Building

Execution: 2011
Location: Brussels
Sector: Tertiair
CHP: INNIO Jenbacher JMS 416
Electral output: 1.127 kWe
Thermal output: 1.191 kWth
fuel: natural gas
Project:

  • integration CHP-module in separate space on the roof of the building
  • heat recuperation for building heating
  • integration exhaust gas heat exchanger in the exhaust gas system

WTC3 Tower (Regie der Gebouwen)

Execution: 2011
Location: Brussels
Sector: Tertiary sector
CHP: INNIO Jenbacher JMS 412
Electral output: 844 kWe
Thermal output: 923 kWth
fuel: natural gas
Project:

  • destruction works existing installation
  • integration CHP-module in accoustical enclosure
  • hot water recuperation for building heating

Cliniques Universitaires UCL de Mont-Godine

Execution: 2011
Location: Yvoir
Sector: hot water recuperation for building heating
CHP: INNIO Jenbacher JMS 320
Electral output: 1.063 kWe
Thermal output: 1.304 kWth
fuel: natural gas
Project:

  • integration CHP-module in accoustical enclosure for outdoor use
  • hot water utilisation for building heating hospital
  • emergency cooling for low temperature hot water circuit

Biogas

Mydibel

Execution: 2006 / 2015 / 2016
Location: Moeskroen
Sector: Food industry
CHP: 4x INNIO Jenbacher JMS 420
Electral output: 5.916 kWe
Thermal output: 7.120 kWth
fuel: Biogas / natural gas
Project:

  • integration CHP-modules in building
  • steam and hot water recuperation for processes
  • Mixing system biogas / natural gas in CHP
  • Utilisation biogas from watertreatment plant

Solae Company (Group Dupont)

Execution: 2006
Location: Ieper
Sector: Food industry
CHP: INNIO Jenbacher JMS 420
Electral output: 1.416 kWe
Thermal output: 1.506 kWth
fuel: Biogas / natural gas
Project:

  • integration CHP-module in accoustical enclosure for outdoor use
  • heat recuperation through production hot air for drying process
  • Mixing system biogas / natural gas in CHP
  • Utilization biogas from waste water treatment plant

Eneco

Execution: 2010
Location: Aalter
Sector: Biogas installation
CHP: 2x INNIO Jenbacher JMS 420
Electral output: 2.830 kWe
Thermal output: 3.830 kWth
fuel: Biogas
Project:

  • integration CHP-modules in engine compartments building
  • Transfer heat to drying process
  • Biogas pressure increase by blower + biogas flare
  • Electrical integration on the public grid

NPG Energy

Execution: 2014
Location: Kallo (Antwerp)
Sector: Biogas installation
CHP: 2x INNIO Jenbacher JMS 420
Electral output: 2.974 kWe
Thermal output: 4.006 kWth
fuel: Biogas
Project:

  • integration CHP-modules in engine compartments building
  • Transfer heat to drying process
  • emergency cooling HT and LT heat in case of insufficient heat demand

Rolf

Sales
Representative
INNIO Jenbacher

Jenbacher is a member of the international group INNIO, and a market leader in the manufacturing and development of gas engine modules. Jenbacher gas engine modules cover a power range of 250 kW to 10 MW with fuel flexibility to run either on natural gas or a number of other gases (biogas, landfill gas, cokes gas, and other special gases).

As part one of the strongest multinational concerns in the world, INNIO Jenbacher delivers onsite power, heat and cooling supply for a variety of commercial, industrial and municipal applications. In particular renewable and waste-to-energy projects, industrial power generation, cogeneration/CHP (combined heat and power), and oilfield power generation. More than 20.000 Jenbacher gas engines are in operation in more than 100 countries.

Ecogen is proud to be the selected authorized sales representative for INNIO Jenbacher in Belgium. On request, we can provide more information on the complete delivery program and the different types of gas engines.

Overview delivery program INNIO Jenbacher